Skip to content
ASIC 目录

Antminer S21 XP Hydro挖矿盈利能力

概述

The Antminer S21 XP Hydro is Bitmain's October 2024 hydro-cooled high-density miner, delivering 473 TH/s at 12 J/TH and 5,676 W. It launched as the hydro counterpart to the air-cooled S21 XP, giving operators access to ~75% more hashrate per chassis at slightly worse efficiency in exchange for the hydro loop's superior thermal headroom and density. The S21 XP Hydro fits industrial datacenter, container farm, and large hosting deployments that already operate hydro infrastructure. Within the Bitmain hydro lineup it sits below the S21e XP Hyd (860 TH/s, 13 J/TH) and the S23 Hydro (580 TH/s, 9.5 J/TH). On the secondary market it offers attractive $/TH for buyers who want hydro economics without the latest-gen premium pricing.

查看术语表 →

规格参数

算力

473 TH/s

功耗

5,676W

能效

12 J/TH

散热方式

Hydro

发布日期

October 2024

Est. $/TH

$23.0/TH

制造商

Bitmain

实时盈利能力

2028 减半的影响

The April 2028 halving cuts the block subsidy from 3.125 to 1.5625 BTC, mechanically halving the hashprice. At today's hashprice ($39/PH/day), the Antminer S21 XP Hydro at 0.473 PH/s generates ~$18/day in gross revenue. Post-halving, that drops to ~$9/day at constant BTC price. Break-even electricity tightens from ~$0.134/kWh today to ~$0.067/kWh post-halving. At 12 J/TH the S21 XP Hydro stays viable post-halving on industrial-rate power; sites with hydro infrastructure can typically run it well into 2029 if their power contract is at $0.05/kWh or below.

查看减半倒计时

与类似机型对比

详细对比

常见问题

Is the Antminer S21 XP Hydro profitable today?

At the current hashprice ($39/PH/day), the S21 XP Hydro generates ~$18/day in gross revenue. Net profitability depends on your hydro operating cost: with a well-tuned loop and electricity at $0.04/kWh, you keep a strong margin; at break-even ($0.134/kWh) you clear zero; above that, you lose. Most industrial hydro sites operate at $0.04–0.06/kWh equivalent, putting the S21 XP Hydro in healthy margin territory.

What's the break-even electricity cost for the Antminer S21 XP Hydro?

At the current hashprice ($39/PH/day), break-even sits at ~$0.134/kWh. The formula: daily revenue (0.473 PH/s × hashprice) divided by daily energy consumption (5.676 kW × 24h = 136 kWh) gives the kWh price at which gross revenue equals electricity cost. Apply 2% pool fee and the practical ceiling drops slightly. After the 2028 halving, break-even tightens to ~$0.067/kWh.

How does the 2028 halving affect the Antminer S21 XP Hydro?

The halving halves the hashprice. For the S21 XP Hydro at 0.473 PH/s, gross daily revenue drops from ~$18 to ~$9 at constant BTC price. Break-even electricity tightens from ~$0.134/kWh to ~$0.067/kWh. At 12 J/TH the machine stays viable post-halving on industrial hydro; the typical exit threshold is sites where power costs above $0.06/kWh, beyond which the post-halving margin disappears.

What's the lifespan of an Antminer S21 XP Hydro?

Hydro-cooled ASICs last 4–6 years of continuous operation in a properly maintained loop (filtered coolant, stable inlet temperature, leak monitoring). The S21 XP Hydro launched October 2024, putting deployed units in their 2nd year. Hardware rarely fails first; economic obsolescence does. Plan a 4-year productive window with the 2028 halving as the inflection point — operators with sub-$0.05/kWh hydro can run it into late 2028 or 2029.

Antminer S21 XP Hydro vs Antminer S23 Hydro — should I upgrade?

The S23 Hydro delivers 580 TH/s at 9.5 J/TH versus 473 TH/s at 12 J/TH for the S21 XP Hydro — about 21% better efficiency and 23% more hashrate per chassis. Upgrading makes sense above $0.05/kWh: the energy savings recover the price gap within 18–30 months and provide a comfortable post-halving margin buffer. Below $0.04/kWh, the S21 XP Hydro stays competitive through 2028. The decision is mostly an electricity-cost calculation, not a hardware preference.

用此 ASIC 模拟获取报价